# Camp Long Leadership Center (0270678), SC — Drinking Water Quality (1995)

> Contaminant levels for the Camp Long Leadership Center (0270678), SC public water system from its 1995 Consumer Confidence Report, compared to federal limits.

- Page: https://www.thewatermap.com/water/sc/camp-long-leadership-center-0270678/1995
- JSON API: https://www.thewatermap.com/api/water/sc/camp-long-leadership-center-0270678/1995
- Source: the utility's annual Consumer Confidence Report (CCR)
- Verification: transcribed by a model, cross-checked by a second model, approved before publishing
- Reporting year: 1995
- Contaminants measured: 1
- Contaminants with a federal limit: 1
- Contaminants at or above the federal limit: 0
- Part of The Water Map — https://www.thewatermap.com

## Contaminants measured

| Contaminant | Category | Measured level | Sampling context | Federal limit | Status |
|---|---|---|---|---|---|
| Lead | Metals | 0.012 mg/L (90th percentile) | At the tap | 0.015 mg/L (Action level) | Approaching the limit |

## What these contaminants are

- **Lead** — A toxic metal that leaches into water from old service lines, solder, and plumbing fixtures. There is no safe level of lead; it harms brain development in children and raises blood pressure in adults. The EPA sets an action level, not a health goal above zero.

## How to read this

- A water-quality report covers an entire service area, not a single address.
- 'Federal limit' is the EPA standard (MCL, action level, treatment technique, etc.) that the measured level is compared against.
- 'At or above the federal limit' means the utility's own reported figure met or exceeded that standard.

_Figures are the utility's own published numbers. Generated 2026-06-13 from thewatermap.com._
