Drinking water quality · 1994

· Verified

What's in Camp Long Leadership Center (0270678), SC tap water

1 contaminants were measured in the Camp Long Leadership Center (0270678), SC water system's 1994 annual report. Each is shown below against its federal limit 1 sit at or above that limit.

Browse the mapFull source report ↗
Reporting year
1994
Contaminants measured
1
Over federal limit
1
Approaching the limit
0
Worst contaminant
Lead
3.1× the limit
Service area
SC
state-level CCR
Source
Utility CCR

Compliance history

Federal Safe Drinking Water Act violation & enforcement records (EPA SDWIS). A violation is a regulatory determination by the state or EPA — separate from the measured levels above.

No federal drinking-water violations on record for this system.

Metals

ContaminantMeasuredStatus
LeadA toxic metal that leaches into water from old service lines, solder, and plumbing fixtures.0.047 mg/L90th percentileAt the tapAt or above the limit
Source: Camp Long Leadership Center (0270678), SC's 1994 Consumer Confidence Report — the annual drinking-water report every U.S. utility is required to publish. The numbers on this page are the utility's own. A water-quality report covers an entire service area, not a single address.

People also ask about Camp Long Leadership Center (0270678), SC's water

+Is Camp Long Leadership Center (0270678), SC tap water safe to drink in 1994?

The 1994 Consumer Confidence Report for the Camp Long Leadership Center (0270678), SC water utility lists 1 contaminant at or above the federal limit: Lead. Whether that means the water is "unsafe" depends on which contaminant, how long the exposure, and individual health factors. The table on this page shows the measured value, the federal threshold, and the regulated statistic used for compliance.

+What contaminants are in Camp Long Leadership Center (0270678), SC tap water?

1 contaminants were measured in Camp Long Leadership Center (0270678), SC's 1994 Consumer Confidence Report, spanning metals. 1 have an enforceable federal limit; the rest are detected but unregulated. Every measured value, in the utility's own units, is on this page.

+Which contaminants exceed federal limits in Camp Long Leadership Center (0270678), SC tap water?

One contaminant in Camp Long Leadership Center (0270678), SC's 1994 report sits at or above the federal limit: Lead (3.1× the limit). The EPA enforces these limits against the regulated reporting statistic — typically a running annual average or 90th percentile — not a one-off sample spike.

+What is the worst contaminant in Camp Long Leadership Center (0270678), SC tap water?

The contaminant with the highest measured value relative to its federal limit in the 1994 report is Lead, at 3.1× the federal threshold. It belongs to the metals family of contaminants.

+Where does the data on this page come from?

Every value is transcribed from Camp Long Leadership Center (0270678), SC's 1994 Consumer Confidence Report — the annual drinking-water report every U.S. public water utility is required by federal law to publish. The original source document is archived and viewable on this site. A water-quality report covers an entire service area, not a single address.

+How often is Camp Long Leadership Center (0270678), SC's water quality data updated?

Each U.S. public water utility publishes one Consumer Confidence Report per year, covering the prior calendar year's measurements. This page reflects the 1994 report; a new report will replace it once the utility publishes its next annual update.

More water systems in SC