Metals · 2017

Lead in Camp Long Leadership Center (0270678), SC tap water

Within the federal limit· 0.3× the limit

Camp Long Leadership Center (0270678), SC's 2017 Lead measurement is below the federal limit of 0.015 mg/L (Action level).

The measurement

StatisticValue
90th percentile
At the tap
0.0045 mg/L

Verbatim from Camp Long Leadership Center (0270678), SC's 2017 Consumer Confidence Report — source document ↗

About Lead

A toxic metal that leaches into water from old service lines, solder, and plumbing fixtures.

There is no safe level of lead; it harms brain development in children and raises blood pressure in adults. The EPA sets an action level, not a health goal above zero.

How Camp Long Leadership Center (0270678), SC compares

Nearby systems also reporting Lead:

People also ask

+Is there Lead in Camp Long Leadership Center (0270678), SC tap water?

Yes — Camp Long Leadership Center (0270678), SC's 2017 Consumer Confidence Report lists Lead at 0.0045 mg/L. Camp Long Leadership Center (0270678), SC's 2017 Lead measurement is below the federal limit of 0.015 mg/L (Action level).

+What's the federal limit for Lead in drinking water?

The federal Action level for Lead is 0.015 mg/L. The EPA enforces this against the regulated reporting statistic (running annual average or 90th percentile), not a single-sample spike.

+What is Lead?

A toxic metal that leaches into water from old service lines, solder, and plumbing fixtures. There is no safe level of lead; it harms brain development in children and raises blood pressure in adults. The EPA sets an action level, not a health goal above zero.

+Where does this Lead measurement come from?

This page reproduces the Lead entry from the 2017 Consumer Confidence Report published by the Camp Long Leadership Center (0270678), SC water utility — the annual drinking-water report every U.S. utility is required by federal law to publish. The original source document is archived at /water/sc/camp-long-leadership-center-0270678/2017/source.

Full report
All Camp Long Leadership Center (0270678), SC water-quality data →
Every contaminant measured in the 2017 report.
Contaminant pillar
Lead across the U.S. →
Every public water system measuring Lead, ranked.